CJEN is a transaction code in SAP PS application with the description — Reconstruct: Summarized Proj.Data. On this page, you will find similar/related TCodes to CJEN, Tables feeding data for this TCode, links to SAP documentation, Wiki and Help pages, discussion threads, and other resources. You will also find related Tables, FMs, ABAP Reports, BW Datasources, and Authorization Objects for CJEN.
CJEN — Meta Data
Description: | Reconstruct: Summarized Proj.Data |
Main Category: | PS |
Sub Category: | Accounting |
SAP Help, Wiki Resources, and Forum Discussions on CJEN
Click the above link for the full list of resources and help pages, only the first few are posted below
-
Budget available in WBS but popping budget exceeded error - SAP Q&A
In a WBS, CNS41 displays budget available but when a service indent is being created it is throwing a budget exceeded error. I have checked in OPS9 the budget control is already active. I have executed CJEN and CJBN. Yet the same error persists. I have checked t-codes CJI3, CJ76, S_ALR_87013557, S_ALR_87013543 etc.
https://answers.sap.com/questions/12408008/budget-available-in-wbs-but-popping-budget-exceede.html
-
Project report issue - SAP Q&A
Another problem facing is in project standard reports s_alr_87013558, s_alr_87013533 actual cost is not showing correctly. Problem is with multiple currency posting projects only. If project is in controlling area currency then everything is correct and CJI3 and above reports matched the figures. But if multiple currency document posted on projects, then CJI3 and above reports not matching with eac...
https://answers.sap.com/questions/9260617/project-report-issue.html
-
Error message after executing tcode CJEN | SCN
When I execute the S_ALR_87013558 Report am getting the error "No costs, revenues or finances were selected
http://scn.sap.com/message/9563427
-
Commitment Value appearing in Budget reportResetSearchResetSearchResetSearch
I have searched for related threads for ECC 6.0 but not found, so wrinting this thread.
http://scn.sap.com/message/9664992
-
Cancel confirmationResetSearchResetSearchResetSearch
recently i came up with a problem that i would like to share with you here for any positive feed back on it.
http://scn.sap.com/message/8906671
-
Actual cost | SCN
When i am Procuring the material to Project through (Requisition + reservation for WBS element) I can't able to see the actual cost to that activity i can able to see the plan cost only. for this i had issued material to the projects also.Please help that i want to do any setting for to see the actual cost of that material Through activity.
http://scn.sap.com/thread/1555582
-
Dates on CJ20N don't match with CN41N | SCN
Hi friends, wanted to find out how to make the dates match between these 2 transactions.. If anyone could explain in case there's a reason why these dates don't match.. tried searching the forum but didn't get the exact answer/reason.
http://scn.sap.com/message/10799428
-
Plan cost not updating | SCN
I plan cost in cj40 with version "0" but it's not coming in report cns41 i set the layout with field (Proj.cost sched.000) what is the reason please help me out.
http://scn.sap.com/message/13845809
-
301 Moved Permanently
After budgeting and release the project; I am not able to see planning cost in information system and planning board for some projects.Give me the solution for how do i solve that issue.
http://scn.sap.com/message/8902007
-
Budget partially /completely not ready for input (error message AP_COPY026
I really need your advice regarding this issue. We already budgeted the project (REL BUDG AVAC). However, when we try to create the PR, it shows the error in commitment check. Normally, i reconstruct using CJEN/CJBN. And the problem solved.Now, it seems that the error must use another solution. I tried to open IMCOC3 and it shows the error message Project UPG-JAINC005: budget partially or completel...
http://scn.sap.com/message/4817366
-
PS budget issue | SCN
when we try to delete PO, we get error message: item 001 Netwk Activity 3300012 0010 budget exceeded.
http://scn.sap.com/message/9304625
Related Transaction Codes
TCODE | Description | Functional Area |
---|---|---|
CJBN | Reconstruct Availability Control | CO - Cost Planning in the WBS |
CJI3 | Project Actual Cost Line Items | Project Systems - Accounting |
CJ20N | Project Builder | Project Systems - Project Builder |
CJ30 | Change Project Original Budget | CO - Cost Planning in the WBS |
CJI5 | Project Commitment Line Items | PS - Accounting |
Tables for SAP Transaction Code CJEN
TABLE | Description | Functional Area |
---|---|---|
RPSCO | Project info database: Costs, revenues, finances | Project Systems - Accounting |
COOI | Commitments Management: Line Items | CO - Overhead Cost Orders |
COSP | CO Object: Cost Totals for External Postings | CO - Overhead Cost Controlling |
COSS | CO Object: Cost Totals for Internal Postings | CO - Overhead Cost Controlling |
PRPS | WBS (Work Breakdown Structure) Element Master Data | Project Systems - Operative Structures |
COEP | CO Object: Line Items (by Period) | CO - Overhead Cost Controlling |
Authorization Objects for SAP Transaction Code CJEN
Most searched SAP Project System TCodes
- Wbs Element TCodes
- Wbs TCodes
- Project TCodes
- Network TCodes
- Create Wbs Element TCodes
- Cj20n TCodes
- Check Wbs Budget TCodes
- Display Network TCodes
- Display Wbs Element TCodes
- Person Responsible TCodes
- Project Definition TCodes
- Cji3 TCodes
- Project Builder TCodes
- Display Wbs TCodes
- Wbs Element List TCodes
- Budget Vs Actual TCodes
- Claim TCodes
- Wbs Report TCodes
- Wbs Elements TCodes
- Network Activity TCodes
- Network Order TCodes
- Cj02 TCodes