CN27 is a transaction code in SAP PS application with the description — Collective Confirmation. On this page, you will find similar/related TCodes to CN27, Tables feeding data for this TCode, links to SAP documentation, Wiki and Help pages, discussion threads, and other resources. You will also find related Tables, FMs, ABAP Reports, BW Datasources, and Authorization Objects for CN27.
CN27 — Meta Data
Description: | Collective Confirmation |
Main Category: | PS |
Sub Category: | Confirmation |
SAP Help, Wiki Resources, and Forum Discussions on CN27
Click the above link for the full list of resources and help pages, only the first few are posted below
-
Confirmations - SAP Help Portal
Transaction ...
https://help.sap.com/viewer/666b7ae6edfe4c05a90ac0150637f964/6.16.12/en-US/a205b753128eb44ce10000000a174cb4.html
-
PS/PM/CS: Postprocessing Transferred Data - Cross-Application Time Sheet (CATS) - SAP Library
http://help.sap.com/saphelp_globext607_10/helpdata/en/64/4004d8470211d189720000e8322d00/content.htm
-
Hundreds of network to close...HELP! - SAP Q&A
I kindly ask for you help with this matter: in our system there are lots of network to confirm and close and other houndreds of network to confirmed to close. Is there a way to do a massive closure of network? I can not close the WBS elements or the project. Thanks in advance for collaboration!
https://answers.sap.com/questions/2983735/hundreds-of-network-to-closehelp.html
-
Actual Duration with collective confirmation - SAP Q&A
actual duration does not appear in confirmation Report CN48N when i confirm activity with collective confirmation CN27
https://answers.sap.com/questions/8247060/actual-duration-with-collective-confirmation.html
-
Not able to create Service PR using CJ20N - SAP Q&A
I am creating service PR using T.Code CJ20N & i am getting dump " Update was Terminated" & not able to generate Purchase Requisition for services.
https://answers.sap.com/questions/10544456/not-able-to-create-service-pr-using-cj20n.html
-
Collective Confirmation CN27 - SAP Q&A
In collective confirmation (CN27), there is two sections one at the top with a single line and other below that with muliple lines.
https://answers.sap.com/questions/5733071/collective-confirmation-cn27.html
-
CN27 - Can someone explain its basics to me please? - SAP Q&A
We just switched over to SAP and I'm currently in charge of closing out a lot of projects. Right now my team is stuck manually confirming every activity which I know can't be the best way to do this. Some searching brought up the CN27 transaction which seems to be made for this as it can confirm multiple activities. However, my bosses did not include that transaction on our privileges list so I can...
https://answers.sap.com/questions/8895138/cn27-can-someone-explain-its-basics-to-me-please.html
-
Factory Calender in Collective Confirmation CN27 - SAP Q&A
i have a problem when i am going to do Collective confirmation in CN27 the factory calender which i use in the project (00) does not come, system use another factory calender with confirmation (MD)
https://answers.sap.com/questions/8234407/factory-calender-in-collective-confirmation-cn27.html
-
How to change the “actual finish date” of an activity?
Is there any way or a transaction to change the "actual finish dates" in the network activities of one or more projects ?
http://scn.sap.com/message/10712105
-
CN27 Transaction - Multiple Networks Dump | SCN
Skip to Content We're sorry, but you're attempting to access SCN content that was not migrated to the new SAP Community experience. ...
http://scn.sap.com/thread/1963105
-
Activity Type for Internal work | SCN
Suppose you dont use CATS, you can make the confirmations directly in CJ20N or using CN25 / CN27 for the activities. The cost will directly get captured to project when you make activity confirmations.You can make personnel assignment to HRMS in workcenters using CNR1. And then assign personnel to activities in CJ20N under personnel assignment TAB of the activity.
http://scn.sap.com/message/8326378
Related Transaction Codes
TCODE | Description | Functional Area |
---|---|---|
CN25 | Confirm Completions in Network | PS - Confirmation |
CN28 | Display Network Confirmations | PS - Confirmation |
CN29 | Cancel Network Confirmation | PS - Confirmation |
CJ20N | Project Builder | Project Systems - Project Builder |
CN23 | Display Network | PS - Network and Activity |
Tables for SAP Transaction Code CN27
TABLE | Description | Functional Area |
---|---|---|
EKPO | Purchasing Document Item | MM - Purchasing |
CPZP | Reporting Points - Periodic Totals Values | CO - Product Cost by Period |
CLST | Link class - BOM | Logistics - Bills of Material |
MARA | General Material Data | Logistics - Material Master |
SOFM | SAPoffice: Folder contents | Basis - Use Subcomponents |
MAKT | Material Descriptions | Logistics - Material Master |
Authorization Objects for SAP Transaction Code CN27
AUTHORIZATION OBJECT | Description | Functional Area |
---|---|---|
S_RFC | Authorization Check for RFC Access |
Most searched SAP Project System TCodes
- Wbs Element TCodes
- Wbs TCodes
- Project TCodes
- Network TCodes
- Create Wbs Element TCodes
- Cj20n TCodes
- Check Wbs Budget TCodes
- Display Network TCodes
- Display Wbs Element TCodes
- Person Responsible TCodes
- Project Definition TCodes
- Cji3 TCodes
- Project Builder TCodes
- Display Wbs TCodes
- Wbs Element List TCodes
- Budget Vs Actual TCodes
- Claim TCodes
- Wbs Report TCodes
- Wbs Elements TCodes
- Network Activity TCodes
- Network Order TCodes
- Cj02 TCodes