OPSB is a transaction code in SAP PS application with the description — Cost Planning Profile. On this page, you will find similar/related TCodes to OPSB, Tables feeding data for this TCode, links to SAP documentation, Wiki and Help pages, discussion threads, and other resources. You will also find related Tables, FMs, ABAP Reports, BW Datasources, and Authorization Objects for OPSB.
OPSB — Meta Data
Description: | Cost Planning Profile |
Main Category: | PS |
Sub Category: | Project System |
SAP Help, Wiki Resources, and Forum Discussions on OPSB
Click the above link for the full list of resources and help pages, only the first few are posted below
-
Document number of Planned cost booked on Project system - SAP Q&A
I have a requirement wherein i need to find out the document number of the cost booked in Project and WBSE. Like for eg in Report S_ALR_87013532, there is planned cost.
https://answers.sap.com/questions/5480835/document-number-of-planned-cost-booked-on-project.html
-
Budget Amendments: From Overall To Annual in Configuration - SAP Q&A
I am trying to make some changes in my Configuration setting,Actually we used overall budget planing but For some new projects we required periodic planning,before making any changes i required the suggestion from the PS Professional.
https://answers.sap.com/questions/9942925/budget-amendments-from-overall-to-annual-in-config.html
-
KKA2 Details - SAP Q&A
In u201CKKA2u201D Plan Data of Valuation Total u201CPlanned Revenueu201D from where this value is updating, if we want to check these planned revenues in which report Iu2019ll get these data. Kindly provide me the details.
https://answers.sap.com/questions/6871118/kka2-details.html
-
Capital projects complete process - SAP Q&A
The issue is when I create order with one material (linked to network and project is created automatically in the background), I am able to change (in change mode) req delivery date for an item, but when I create order with 2 materials (linked to network and project is created automatically in the background), I can not change (in change mode) the req delivery date of any item. Req delivery date is...
https://answers.sap.com/questions/6501868/unable-to-change-requested-delivery-date-in-the-sa.html
-
Planned Revenue not recognized on WBS - SAP Q&A
This is with reference to your similar problem in WBS not recognizing planned revenues (Sales Pricing). As per your steps even I have checked all the setting in PS as well in SD but still not able to short out the problem. Can you please let me know is your problem solved, if yes then let me know how to solve it.
https://answers.sap.com/questions/3977195/planned-revenue-not-recognized-on-wbs.html
-
PS revenue planing transfer - SAP Q&A
how to transfer SO billing plan to PS revenue plan?, any additional configuration needed?
https://answers.sap.com/questions/9547921/ps-revenue-planing-transfer.html
-
KP26 error that 'P' rate type to be maintained
While creating a Workcenter with CNR1, in the Costing field it is showing error Activity Type is not assigned to Cost Center. When that is being done through transaction KP26 it is throwing error that 'P' rate type to be maintained in system settings.The present rate type setting is with 'M'. If I change it to 'P' in transaction OPSB, what will be its financial implications. Is it right to do so?
http://scn.sap.com/message/5853505
-
Total Up not working in Cost Plan Version | SCN
I had selected the Bottom-up planning indicator in T-code OPSB for Cost Planning profile, due to which automatic Total Up is activated in CJ40 Transaction for Default version '0' but when same cost plan will be copied into other version '1' from version '0' from Transcation CJ9BS, Total up is not happining automatically,
http://scn.sap.com/message/10367189
-
Capital projects complete process | SCN
Can you please explain the complete process of Capital projects, please update me the steps how we are handing this projects with transaction codes, Ex. like Budgets, cost planning settlements and how the financial entries will be updating.
http://scn.sap.com/message/8162296
-
Cost Element Group | SCN
I have to assign this to Planning profile Tcode OPSB in the field "Prim. CElen. grp" , but not able to assign it.
http://scn.sap.com/message/4585014
-
Revenue planning | SCN
Former Member
18 Views
http://scn.sap.com/thread/3225044
Related Transaction Codes
TCODE | Description | Functional Area |
---|---|---|
OPSA | Maintain Project Profile | PS - Operative Structures |
CJ20N | Project Builder | Project Systems - Project Builder |
SPRO | Customizing - Edit Project | Basis - Customizing Project Management (IMG) |
OPS9 | Budget Management Profile | PS - Project System |
OPUV | Network Type Parameters | PS - Network and Activity |
Tables for SAP Transaction Code OPSB
TABLE | Description | Functional Area |
---|---|---|
T100 | Messages | Basis - Activation Program, Conversion Program, DB Utility, MC, SPDD |
BSIK | Accounting: Secondary Index for Vendors | FI - Financial Accounting |
ACEPSOIT_UPD | Generated Table for View ACEPSOIT_UPD | FI - Accrual Engine |
T141 | Material Status from Materials Management/PPC View | Logistics - Material Master |
T142 | Storage Conditions for Materials | Logistics - Material Master |
MSEG | Document Segment: Material | MM - Inventory Management |
Authorization Objects for SAP Transaction Code OPSB
AUTHORIZATION OBJECT | Description | Functional Area |
---|---|---|
F_BKPF_KOA | Accounting Document: Authorization for Account Types | |
F_BKPF_BLA | Accounting Document: Authorization for Document Types |
Most searched SAP Project System TCodes
- Wbs Element TCodes
- Wbs TCodes
- Project TCodes
- Network TCodes
- Create Wbs Element TCodes
- Cj20n TCodes
- Check Wbs Budget TCodes
- Display Network TCodes
- Display Wbs Element TCodes
- Person Responsible TCodes
- Project Definition TCodes
- Cji3 TCodes
- Project Builder TCodes
- Display Wbs TCodes
- Wbs Element List TCodes
- Budget Vs Actual TCodes
- Claim TCodes
- Wbs Report TCodes
- Wbs Elements TCodes
- Network Activity TCodes
- Network Order TCodes
- Cj02 TCodes