SAP Production Planning and Control TCodes by Sub-Module
- 1. PP General TCodes
- 2. TCodes (PP-SOP)
- 3. Production Planning for Process Industries TCodes (PP-PI)
- 4. TCodes (PP-BD)
- 5. Plant Data Collection TCodes (PP-PDC)
- 6. Production Orders TCodes (PP-SFC)
- 7. TCodes (PP-CRP)
- 8. Material Requirements Planning TCodes (PP-MRP)
- 9. Repetitive Manufacturing TCodes (PP-REM)
- 10. Flow Manufacturing TCodes (PP-FLW)
- 11. KANBAN TCodes (PP-KAB)
- 12. Production Planning TCodes (PP-MP)
- 13. Information System TCodes (PP-IS)
- 14. TCodes (PP-PN)
- 15. TCodes (PP-PEO)
- 16. Integration with Manufacturing Execution Systems TCodes (PP-MES)
PP General TCodes
| S.No | Tcode | Description |
|---|---|---|
| 1 | MD04 | Display Stock/Requirements Situation |
| 2 | CO11N | Single Screen Entry of Confirmations |
| 3 | COGI | Postprocess Faulty Goods Movements |
| 4 | COOIS | Production Order Information System |
| 5 | MD01 | MRP Run |
| 6 | MFBF | Backflushing In Repetitive Mfg |
| 7 | MD61 | Create Planned Indep. Requirements |
| 8 | MD02 | MRP - Single-item, Multi-level - |
| 9 | CO02 | Change Production Order |
| 10 | OPCH | Maintain production scheduler |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP General TCodes |
||
TCodes (PP-SOP)
| S.No | Tcode | Description |
|---|---|---|
| 1 | MC94 | Change Flexible LIS Planning |
| 2 | MC62 | Change Planning Hierarchy |
| 3 | MC87 | Sales and Operations Planning |
| 4 | MC84 | Create Product Group |
| 5 | MC93 | Create Flexible LIS Planning |
| 6 | MC74 | Transfer Mat. to Demand Management |
| 7 | MC88 | Sales and Operations Planning |
| 8 | MC78 | Copy SOP Version |
| 9 | MC90 | Tsfr.to Dm.Mgmt.: Mat.from any IS |
| 10 | MC7F | Planning Parameters |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP TCodes (PP-SOP) |
||
Production Planning for Process Industries TCodes (PP-PI)
| S.No | Tcode | Description |
|---|---|---|
| 1 | COR6N | Single Screen Entry of Confirmations |
| 2 | COR1 | Create Process Order |
| 3 | COR2 | Change Process Order |
| 4 | C223 | Maintain Production Versions |
| 5 | COR6 | Single Process Order Confirmation |
| 6 | COAL | Read Order Record from Archive |
| 7 | CONC | No.Range for CtrlRecipes: COCB_CRID |
| 8 | C201 | Create Master Recipe |
| 9 | COR3 | Display Process Order |
| 10 | CORK | Process Order Confirmations (Total) |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP Production Planning for Process Industries TCodes (PP-PI) |
||
TCodes (PP-BD)
| S.No | Tcode | Description |
|---|---|---|
| 1 | CA02 | Change Routing |
| 2 | CA01 | Create Routing |
| 3 | CA03 | Display Routing |
| 4 | CEWB | PP: Engineering Workbench |
| 5 | CR02 | Change Work Center |
| 6 | CR01 | Create Work Center |
| 7 | CR10 | Work center change documents |
| 8 | CR11 | Add Capacity |
| 9 | CA11 | Create Reference Operation Set |
| 10 | CA98 | Deletion of task lists |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP TCodes (PP-BD) |
||
Plant Data Collection TCodes (PP-PDC)
| S.No | Tcode | Description |
|---|---|---|
| 1 | CI42N | PP-PDC: Download Operations |
| 2 | CIP2 | CC2: Update PDC messages |
| 3 | CI44 | Delta transfer of operations for PP |
| 4 | CI41 | Communication parameters for PP |
| 5 | CI42 | Init. transfer of operations for PP |
| 6 | CI39 | Delta transfer of operations for PS |
| 7 | CB35 | Upload request for CC3 |
| 8 | CIPV | Posting PDC records |
| 9 | CB42 | Initial Download of Orders via CC2 |
| 10 | CI43 | Transfer of master data for PP |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP Plant Data Collection TCodes (PP-PDC) |
||
Production Orders TCodes (PP-SFC)
| S.No | Tcode | Description |
|---|---|---|
| 1 | CO11N | Single Screen Entry of Confirmations |
| 2 | COGI | Postprocess Faulty Goods Movements |
| 3 | COOIS | Production Order Information System |
| 4 | CO02 | Change Production Order |
| 5 | CO15 | Enter Production order Confirmation |
| 6 | CO01 | Create production order |
| 7 | COSS | Transport of C Tables |
| 8 | OPL8 | Order type parameters: Overview |
| 9 | CO03 | Display Production Order |
| 10 | OPK4 | Confirmation Parameters |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP Production Orders TCodes (PP-SFC) |
||
TCodes (PP-CRP)
| S.No | Tcode | Description |
|---|---|---|
| 1 | OPCH | Maintain production scheduler |
| 2 | CM01 | Cap. planning, work center load |
| 3 | CM25 | Capacity leveling: Variable |
| 4 | CM21 | Capacity leveling SFC planning table |
| 5 | OPU3 | Production order control parameters |
| 6 | OPU5 | Parameter long term planning PlndOrd |
| 7 | OPCI | Setup group key/category |
| 8 | OPA5 | Define graphics profile |
| 9 | CM38 | Capacity leveling L-T planning |
| 10 | CM50 | Capacity level.: SFC work cntr list |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP TCodes (PP-CRP) |
||
Material Requirements Planning TCodes (PP-MRP)
| S.No | Tcode | Description |
|---|---|---|
| 1 | MD04 | Display Stock/Requirements Situation |
| 2 | MD01 | MRP Run |
| 3 | MD02 | MRP - Single-item, Multi-level - |
| 4 | MSDS | LTP Evaluation Report Coverages |
| 5 | MDBT | MRP Run In Batch |
| 6 | MD03 | MRP-Individual Planning-Single Level |
| 7 | MD05 | Individual Display Of MRP List |
| 8 | OPPQ | C M MRP Plant Parameters for MRP |
| 9 | MD50 | Sales order planning |
| 10 | MD06 | Collective Display Of MRP List |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP Material Requirements Planning TCodes (PP-MRP) |
||
Repetitive Manufacturing TCodes (PP-REM)
| S.No | Tcode | Description |
|---|---|---|
| 1 | MFBF | Backflushing In Repetitive Mfg |
| 2 | MF60 | Pull List |
| 3 | MF50 | Planning Table - Change |
| 4 | MF47 | Open Reprocessing Records / Pr.Line |
| 5 | OSPP | Customizing for Pull List |
| 6 | MF42N | New Collective Entry |
| 7 | MF41 | Reverse Backflush (With ALV) |
| 8 | MF12 | Display Document Log (With ALV) |
| 9 | MF30 | Create PrelimCostEst - ProdCostColl. |
| 10 | OSP2 | Repetitive Mfg Profile |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP Repetitive Manufacturing TCodes (PP-REM) |
||
Flow Manufacturing TCodes (PP-FLW)
| S.No | Tcode | Description |
|---|---|---|
| 1 | MDVP | Collective Availability Check PAUF |
| 2 | LD00 | Line Design |
| 3 | LDB1 | Create Line Hierarchy |
| 4 | LAS2 | Change Sequence Schedule |
| 5 | OSQ2 | Customizing for Sequencing: Planning |
| 6 | LDB2 | Change Line Hierarchy |
| 7 | LDB3 | Display Line Hierarchy |
| 8 | LDD1 | Create Line Balance |
| 9 | LDE1 | Work Instruction for Routing |
| 10 | LAS3 | Display Sequence Schedule |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP Flow Manufacturing TCodes (PP-FLW) |
||
KANBAN TCodes (PP-KAB)
| S.No | Tcode | Description |
|---|---|---|
| 1 | OM17 | Define Actions for Status Switching |
| 2 | PK13N | Kanban Board: Demand Source View |
| 3 | PKMC | Control Cycle Maintenance |
| 4 | PKBC | Chnge Container Status With Bar Code |
| 5 | PK01 | Create Control Cycle |
| 6 | LPK1 | Create Control Cycle for WM |
| 7 | OM16 | Maintain Kanban Status Sequences |
| 8 | PK05 | PP Maintain Supply Area (Kanban) |
| 9 | OM13 | Control Profile: Stock Transfer |
| 10 | LPK2 | Change Control Cycle for WM |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP KANBAN TCodes (PP-KAB) |
||
Production Planning TCodes (PP-MP)
| S.No | Tcode | Description |
|---|---|---|
| 1 | MD61 | Create Planned Indep. Requirements |
| 2 | MD62 | Change Planned Indep. Requirements |
| 3 | MD74 | Reorganization: Adapt Indep.Reqmts |
| 4 | MD63 | Display Planned Indep. Requirements |
| 5 | MD81 | Create Customer Indep. Requirements |
| 6 | MD75 | Reorganization: Delete Indep.Reqmts |
| 7 | MD73 | Display Total Indep. Requirements |
| 8 | MP38 | Total Forecast Run |
| 9 | MD70 | Copy Total Forecast |
| 10 | MP30 | Execute Material Forecast |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP Production Planning TCodes (PP-MP) |
||
Information System TCodes (PP-IS)
| S.No | Tcode | Description |
|---|---|---|
| 1 | MCRE | Material Usage Analysis: Selection |
| 2 | MCRX | PP-PI: Material Usage Analysis |
| 3 | MCRP | Matl consumptn anal.: repetitive mfg |
| 4 | MCP1 | SFIS: Operation Analysis Selection |
| 5 | MCP6 | Goods rcpt analysis: repetitive mfg |
| 6 | MCRM | Reporting Point Stats.: Selection |
| 7 | MCP9 | SFIS: Select Run Schedule |
| 8 | MCRI | Product Cost Analysis: Selection |
| 9 | MCPK | Operation analysis: Quantities |
| 10 | MCPM | Production order anal.: Quantities |
| .... | ......... | ........................................................... |
| .... | ......... | ........................................................... |
View the full list of SAP PP Information System TCodes (PP-IS) |
||
TCodes (PP-PN)
| S.No | Tcode | Description |
|---|---|---|
View the full list of SAP PP TCodes (PP-PN) |
||
TCodes (PP-PEO)
| S.No | Tcode | Description |
|---|---|---|
| 1 | MSFR4 | Manage Shop Floor Routings |
| 2 | MSFR2 | Change Shop Floor Routing |
| 3 | MSFR5 | Change Shop Floor Routing Version |
| 4 | MSFR1 | Create Shop Floor Routing |
View the full list of SAP PP TCodes (PP-PEO) |
||
Integration with Manufacturing Execution Systems TCodes (PP-MES)
| S.No | Tcode | Description |
|---|---|---|
| 1 | COMES_CAPA_ALLOC | Assignment Individual Cap. - Equipm. |
View the full list of SAP PP Integration with Manufacturing Execution Systems TCodes (PP-MES) |
||
Most viewed SAP Production Planning and Control TCodes
- Factory Calendar TCodes
- Work Center TCodes
- Production Order TCodes
- Routing TCodes
- Planned Order TCodes
- Display Work Center TCodes
- Process Order TCodes
- Forecast TCodes
- Mrp TCodes
- Display Work Orders TCodes
- Order Confirmation TCodes
- Md04 TCodes
- Production Version TCodes
- Display Production Order TCodes
- Master Recipe TCodes
- Confirmation TCodes
- Mrp List TCodes
- Production TCodes
- Recipe TCodes
- Scrap TCodes
- Production Order Confirmation TCodes
- Planned Independent Requirements TCodes